You cannot inspect a bearing into quality, but you can catch a wrong or damaged lot before it reaches the line. This is what to check, how many pieces, and what to write down.
| Paperwork | Order vs packing list vs certificate vs marking on the box |
|---|---|
| Visual | Rust, seal damage, cage damage, marking legibility, grease presence |
| Dimensional | Bore, OD, width, runout, clearance on the sample |
| Sampling | ISO 2859-1, AQL as agreed — 1.0 unless specified |
| Record | Lot number, sample size, measured values, inspector, date |
| Rejection | Quarantine the lot, photograph, notify within the claim window |
| Check | Instrument | Acceptance basis | Record |
|---|---|---|---|
| Bore diameter | Bore gauge | ISO 492 for the class ordered | Actual value |
| Outside diameter | Micrometer | ISO 492 for the class ordered | Actual value |
| Width | Micrometer | ISO 492 for the class ordered | Actual value |
| Radial runout | V-block + dial gauge | Per the precision class | Max reading |
| Internal clearance | Clearance gauge | Per the C-class ordered | Actual value |
Use the AQL on the purchase order; ISO 2859-1 at AQL 1.0 normal inspection is the usual default. For a lot of 501–1,200 pieces that means 80 pieces sampled, accept on 2, reject on 3. Recording the sample size is what makes the result defensible.
| Lot size | Sample | Accept | Reject |
|---|---|---|---|
| 26–50 | 8 | 0 | 1 |
| 51–90 | 13 | 0 | 1 |
| 91–150 | 20 | 0 | 1 |
| 151–280 | 32 | 1 | 2 |
| 281–500 | 50 | 1 | 2 |
| 501–1,200 | 80 | 2 | 3 |
No. Inspect the first lot from a supplier fully, then reduce to a skip-lot or reduced-inspection plan while the supplier performs. Return to full inspection after any rejection.
Quarantine the lot until it arrives, and record the delay. A missing certificate is a documentation non-conformity, not a reason to reject good parts — but it must be closed before the parts are used.
Measure the displacement of the outer ring relative to the inner under a defined axial load with a dial gauge. It is less precise than a dedicated gauge but adequate for a comparison against the specified class.
In our experience, wrong suffix rather than wrong size: the bore and OD are right, the seal or clearance is not. That is why the paperwork check comes before the dimensional check.
Send the BOM, the inspection plan or the failure photos. We will run through the same checklist and send back the gaps.