Global Shipping · OEM & Custom Bearings Welcome
Home › Resources › Sourcing checklist

Bearing Sourcing Checklist — 22 Questions Before the PO

Most bearing problems are decided before the purchase order, not after: an ambiguous specification, an unverified supplier, or a price that was never comparable. This is the checklist that catches them.

22 questions5 sectionsPrintable
Short answer. Ask five things before ordering: is the specification complete (suffix, clearance, cage, seal, grease); is the supplier verified (authorised channel, traceability); is the documentation agreed (CoC, 3.1, dimensional report); are the commercial terms comparable (Incoterm, currency, validity); and what is the failure plan (claim window, replacement, analysis).

At a glance

What this checklist covers and who it is for.
SectionsSpecification · Supplier · Documentation · Commercial · Risk
Questions22, each answerable yes/no or with a value
Time to complete20–30 minutes for a new supplier, 5 minutes for a repeat order
OutputA comparable quotation and a documented decision

1. Specification — six questions

An incomplete number is an invitation to substitute.
  1. Is the full designation written, including every suffix (seal, clearance, cage, precision, heat treatment)?
  2. Are the three boundary dimensions stated, or is the number trusted to define them?
  3. Is the internal clearance specified, or left to the supplier's default?
  4. Is the cage material specified where it matters (brass, polyamide, PEEK, phenolic)?
  5. Is the grease or oil named, with the fill quantity and the temperature range?
  6. Is the required precision class stated (P0, P6, P5, P4) or implied?

2. Supplier — five questions

Price is not evidence of capability.
  1. Is the supplier buying through authorised channels for the brands quoted?
  2. Can they state which plant the part is made in?
  3. Do they publish specifications, or only pictures and prices?
  4. What is their response time on a technical question — tested, not claimed?
  5. Have they supplied this category before, and can they show a reference?

3. Documentation — four questions

Agree it at quotation stage or pay for it later.
  1. Is a certificate of conformity included as standard, and in whose name?
  2. Is an EN 10204 3.1 mill certificate available, and at what cost and lead time?
  3. Is a dimensional inspection report included, and against which standard?
  4. Are RoHS/REACH declarations available for the part and the coating?

4. Commercial — four questions

The only way two quotes become comparable.
  1. Is the Incoterm stated (EXW, FOB, CIF, DDP) and the named place?
  2. Is the currency and the exchange-rate basis stated?
  3. Is the validity period stated, and the quantity break?
  4. Is the MOQ stated per size, and the surcharge for mixed orders?

5. Risk — three questions

Decide now what happens if it goes wrong.
  1. What is the claim window and what evidence is required?
  2. Who pays return freight on a rejected lot?
  3. Is there a second source for this part, and how long would it take to switch?

The 22 questions in one table

Print this, tick it, file it with the PO.
#QuestionSectionAnswer
1–6Full designation, dimensions, clearance, cage, lubricant, precisionSpecification☐
7–11Authorised channel, plant, published specs, response time, referenceSupplier☐
12–15CoC, 3.1 certificate, dimensional report, RoHS/REACHDocumentation☐
16–19Incoterm, currency, validity, MOQCommercial☐
20–22Claim window, return freight, second sourceRisk☐
The one question that matters most. If the quotation does not state the suffix in full, nothing else on this list can save the order. A 6205-2RS and a 6205-2RS1 are the same size and not the same bearing.

Frequently asked questions

What is the most common sourcing mistake?

An incomplete designation. “6205-2RS” without clearance, cage or grease leaves the supplier to choose, and the cheapest choice is rarely the one the application needs.

Should I always ask for a 3.1 certificate?

Ask when the part is safety-related, when the material grade matters to the process, or when your own customer requires it. For a standard replacement bearing in a conveyor, a certificate of conformity is usually enough.

How do I compare quotes from two countries?

Convert to total landed cost: unit price, freight, duty, handling, administration and the cost of a stockout. The lowest unit price is frequently not the lowest landed cost.

How many suppliers should I qualify?

Two per critical category. One is a single point of failure; three is administration you will not maintain.

Want this checked against a real list?

Send the BOM, the inspection plan or the failure photos. We will run through the same checklist and send back the gaps.